- Hot dip galvanized frame, strong profile (123mm)
- fewer anchors
- durable plastic panel
- long distances between the anchors (for 1.35 m) allow you to speed up the work
- stripping corners allow disassemble the elevator shaft formwork within 20 minutes
- using special locks.
- Compatibility with a small shield frame is possible formwork Frami Xlife
Opportunity to purchase and new and used formwork.